Add post on planning and scheduling for project management

Improve introduction and add problem description

Add description of the classification scheme for scheduling problems

Add description of the general project management workflow

Add references

Add section on algorithms

Add conclusion and final edits
This commit is contained in:
Dimitri Lozeve 2021-04-02 18:12:00 +02:00
parent 1e5e508901
commit 4c9a78744b
2 changed files with 433 additions and 0 deletions

View file

@ -480,3 +480,138 @@
isbn = 9781105571817,
}
@book{pinedo2009_plann_sched_manuf_servic,
author = {Michael L. Pinedo},
title = {Planning and Scheduling in Manufacturing and
Services},
year = 2009,
publisher = {Springer},
url = {https://doi.org/10.1007/978-1-4419-0910-7},
DATE_ADDED = {Tue Mar 16 13:37:36 2021},
address = {New York},
doi = {10.1007/978-1-4419-0910-7},
edition = 2,
isbn = {978-1-4419-0909-1},
pages = 536,
series = {Springer Series in Operations Research and Financial
Engineering},
}
@book{pinedo2016_sched,
author = {Michael L. Pinedo},
title = {Scheduling},
year = 2016,
publisher = {Springer International Publishing},
url = {https://doi.org/10.1007/978-3-319-26580-3},
DATE_ADDED = {Tue Mar 16 13:40:49 2021},
doi = {10.1007/978-3-319-26580-3},
edition = 5,
isbn = {978-3-319-26578-0},
pages = 670,
subtitle = {Theory, Algorithms, and Systems},
}
@Book{leung2004_handb_sched,
author = {Leung, Joseph},
title = {Handbook of Scheduling : Algorithms, Models, and
Performance Analysis},
year = 2004,
publisher = {Chapman \& Hall/CRC},
address = {Boca Raton},
isbn = 9781584883975,
pages = 1120,
}
@book{błażewicz2001_sched_comput_manuf_proces,
author = {Jacek Błażewicz and Klaus H. Ecker and Erwin Pesch
and G{\"u}nter Schmidt and Jan Węglarz},
title = {Scheduling Computer and Manufacturing Processes},
year = 2001,
publisher = {Springer Berlin Heidelberg},
url = {https://doi.org/10.1007/978-3-662-04363-9},
DATE_ADDED = {Tue Mar 16 13:44:38 2021},
doi = {10.1007/978-3-662-04363-9},
edition = 2,
isbn = {978-3-540-41931-0},
pages = 485,
}
@book{brucker2007_sched_algor,
author = {Brucker, Peter},
title = {Scheduling Algorithms},
year = 2007,
publisher = {Springer Berlin Heidelberg},
url = {https://doi.org/10.1007/978-3-540-69516-5},
DATE_ADDED = {Tue Mar 16 13:46:16 2021},
doi = {10.1007/978-3-540-69516-5},
edition = 5,
isbn = {978-3-540-69515-8},
pages = 371,
}
@Book{conway2003_theor_sched,
author = {Conway, Richard and Maxwell, William L. and Miller,
Louis W.},
title = {Theory of Scheduling},
year = 2003,
publisher = {Dover},
address = {Mineola, N.Y},
isbn = 0486428176,
}
@article{brucker1999_resour_const_projec_sched,
author = {Peter Brucker and Andreas Drexl and Rolf M{\"o}hring
and Klaus Neumann and Erwin Pesch},
title = {Resource-Constrained Project Scheduling: Notation,
Classification, Models, and Methods},
journal = {European Journal of Operational Research},
volume = {112},
number = {1},
pages = {3-41},
year = {1999},
doi = {10.1016/s0377-2217(98)00204-5},
url = {https://doi.org/10.1016/s0377-2217(98)00204-5},
DATE_ADDED = {Wed Mar 17 22:44:09 2021},
}
@article{atabakhsh1991_survey_const_based_sched_system,
author = {H. Atabakhsh},
title = {A Survey of Constraint Based Scheduling Systems
Using an Artificial Intelligence Approach},
journal = {Artificial Intelligence in Engineering},
volume = {6},
number = {2},
pages = {58-73},
year = {1991},
doi = {10.1016/0954-1810(91)90001-5},
url = {https://doi.org/10.1016/0954-1810(91)90001-5},
DATE_ADDED = {Thu Mar 18 13:52:34 2021},
}
@article{noronha1991_knowl_based_approac_sched_probl,
author = {S.J. Noronha and V.V.S. Sarma},
title = {Knowledge-Based Approaches for Scheduling Problems:
a Survey},
journal = {IEEE Transactions on Knowledge and Data Engineering},
volume = {3},
number = {2},
pages = {160-171},
year = {1991},
doi = {10.1109/69.87996},
url = {https://doi.org/10.1109/69.87996},
DATE_ADDED = {Thu Mar 18 13:52:50 2021},
}
@article{smith1992_knowl_based_produc_manag_approac_resul_prosp,
author = {Stephen F. Smith},
title = {Knowledge-Based Production Management Approaches,
Results and Prospects},
journal = {Production Planning \& Control},
volume = {3},
number = {4},
pages = {350-380},
year = {1992},
doi = {10.1080/09537289208919407},
url = {https://doi.org/10.1080/09537289208919407},
DATE_ADDED = {Thu Mar 18 13:53:35 2021},
}