Add post on planning and scheduling for project management
Improve introduction and add problem description Add description of the classification scheme for scheduling problems Add description of the general project management workflow Add references Add section on algorithms Add conclusion and final edits
This commit is contained in:
parent
1e5e508901
commit
4c9a78744b
2 changed files with 433 additions and 0 deletions
|
@ -480,3 +480,138 @@
|
|||
isbn = 9781105571817,
|
||||
}
|
||||
|
||||
@book{pinedo2009_plann_sched_manuf_servic,
|
||||
author = {Michael L. Pinedo},
|
||||
title = {Planning and Scheduling in Manufacturing and
|
||||
Services},
|
||||
year = 2009,
|
||||
publisher = {Springer},
|
||||
url = {https://doi.org/10.1007/978-1-4419-0910-7},
|
||||
DATE_ADDED = {Tue Mar 16 13:37:36 2021},
|
||||
address = {New York},
|
||||
doi = {10.1007/978-1-4419-0910-7},
|
||||
edition = 2,
|
||||
isbn = {978-1-4419-0909-1},
|
||||
pages = 536,
|
||||
series = {Springer Series in Operations Research and Financial
|
||||
Engineering},
|
||||
}
|
||||
|
||||
@book{pinedo2016_sched,
|
||||
author = {Michael L. Pinedo},
|
||||
title = {Scheduling},
|
||||
year = 2016,
|
||||
publisher = {Springer International Publishing},
|
||||
url = {https://doi.org/10.1007/978-3-319-26580-3},
|
||||
DATE_ADDED = {Tue Mar 16 13:40:49 2021},
|
||||
doi = {10.1007/978-3-319-26580-3},
|
||||
edition = 5,
|
||||
isbn = {978-3-319-26578-0},
|
||||
pages = 670,
|
||||
subtitle = {Theory, Algorithms, and Systems},
|
||||
}
|
||||
|
||||
@Book{leung2004_handb_sched,
|
||||
author = {Leung, Joseph},
|
||||
title = {Handbook of Scheduling : Algorithms, Models, and
|
||||
Performance Analysis},
|
||||
year = 2004,
|
||||
publisher = {Chapman \& Hall/CRC},
|
||||
address = {Boca Raton},
|
||||
isbn = 9781584883975,
|
||||
pages = 1120,
|
||||
}
|
||||
|
||||
@book{błażewicz2001_sched_comput_manuf_proces,
|
||||
author = {Jacek Błażewicz and Klaus H. Ecker and Erwin Pesch
|
||||
and G{\"u}nter Schmidt and Jan Węglarz},
|
||||
title = {Scheduling Computer and Manufacturing Processes},
|
||||
year = 2001,
|
||||
publisher = {Springer Berlin Heidelberg},
|
||||
url = {https://doi.org/10.1007/978-3-662-04363-9},
|
||||
DATE_ADDED = {Tue Mar 16 13:44:38 2021},
|
||||
doi = {10.1007/978-3-662-04363-9},
|
||||
edition = 2,
|
||||
isbn = {978-3-540-41931-0},
|
||||
pages = 485,
|
||||
}
|
||||
|
||||
@book{brucker2007_sched_algor,
|
||||
author = {Brucker, Peter},
|
||||
title = {Scheduling Algorithms},
|
||||
year = 2007,
|
||||
publisher = {Springer Berlin Heidelberg},
|
||||
url = {https://doi.org/10.1007/978-3-540-69516-5},
|
||||
DATE_ADDED = {Tue Mar 16 13:46:16 2021},
|
||||
doi = {10.1007/978-3-540-69516-5},
|
||||
edition = 5,
|
||||
isbn = {978-3-540-69515-8},
|
||||
pages = 371,
|
||||
}
|
||||
|
||||
@Book{conway2003_theor_sched,
|
||||
author = {Conway, Richard and Maxwell, William L. and Miller,
|
||||
Louis W.},
|
||||
title = {Theory of Scheduling},
|
||||
year = 2003,
|
||||
publisher = {Dover},
|
||||
address = {Mineola, N.Y},
|
||||
isbn = 0486428176,
|
||||
}
|
||||
|
||||
@article{brucker1999_resour_const_projec_sched,
|
||||
author = {Peter Brucker and Andreas Drexl and Rolf M{\"o}hring
|
||||
and Klaus Neumann and Erwin Pesch},
|
||||
title = {Resource-Constrained Project Scheduling: Notation,
|
||||
Classification, Models, and Methods},
|
||||
journal = {European Journal of Operational Research},
|
||||
volume = {112},
|
||||
number = {1},
|
||||
pages = {3-41},
|
||||
year = {1999},
|
||||
doi = {10.1016/s0377-2217(98)00204-5},
|
||||
url = {https://doi.org/10.1016/s0377-2217(98)00204-5},
|
||||
DATE_ADDED = {Wed Mar 17 22:44:09 2021},
|
||||
}
|
||||
|
||||
@article{atabakhsh1991_survey_const_based_sched_system,
|
||||
author = {H. Atabakhsh},
|
||||
title = {A Survey of Constraint Based Scheduling Systems
|
||||
Using an Artificial Intelligence Approach},
|
||||
journal = {Artificial Intelligence in Engineering},
|
||||
volume = {6},
|
||||
number = {2},
|
||||
pages = {58-73},
|
||||
year = {1991},
|
||||
doi = {10.1016/0954-1810(91)90001-5},
|
||||
url = {https://doi.org/10.1016/0954-1810(91)90001-5},
|
||||
DATE_ADDED = {Thu Mar 18 13:52:34 2021},
|
||||
}
|
||||
|
||||
@article{noronha1991_knowl_based_approac_sched_probl,
|
||||
author = {S.J. Noronha and V.V.S. Sarma},
|
||||
title = {Knowledge-Based Approaches for Scheduling Problems:
|
||||
a Survey},
|
||||
journal = {IEEE Transactions on Knowledge and Data Engineering},
|
||||
volume = {3},
|
||||
number = {2},
|
||||
pages = {160-171},
|
||||
year = {1991},
|
||||
doi = {10.1109/69.87996},
|
||||
url = {https://doi.org/10.1109/69.87996},
|
||||
DATE_ADDED = {Thu Mar 18 13:52:50 2021},
|
||||
}
|
||||
|
||||
@article{smith1992_knowl_based_produc_manag_approac_resul_prosp,
|
||||
author = {Stephen F. Smith},
|
||||
title = {Knowledge-Based Production Management Approaches,
|
||||
Results and Prospects},
|
||||
journal = {Production Planning \& Control},
|
||||
volume = {3},
|
||||
number = {4},
|
||||
pages = {350-380},
|
||||
year = {1992},
|
||||
doi = {10.1080/09537289208919407},
|
||||
url = {https://doi.org/10.1080/09537289208919407},
|
||||
DATE_ADDED = {Thu Mar 18 13:53:35 2021},
|
||||
}
|
||||
|
|
Loading…
Add table
Add a link
Reference in a new issue